Mokolo and Crocodile River West Water Augmentation Project (MCWAP)
Environmental Impact Assessment Process
- CER submissions on behalf of Earthlife Africa on the Background Information Document for the proposed MCWAP-Phase 2 project (24 June 2016)
- CER comments on behalf of Earthlife Africa and groundWork on the Draft Scoping Report for the MCWAP-Phase 2 (11 April 2018)
- Annexure A: ERC NERSA Presentation”An Assessment of New Coal Plants in South Africa’s Electricity Future” (27 March 2018)
- Annexure B: B. Udall, “21st Century Climate Change Impacts on Mokolo and Crocodile (West) River Flows” (26 February 2018)
- Annexure C: Thabametsi Climate Resilience Assessment Report (June 2017)
Water Use Licence Process
- CER Objections to MCWAP WUL (14 June 2022)
- Response Report to MCWAP WULA Objections (25 August 2022)
- Annexure A – Nick-King-Report-Final
- Annexure B – Medupi FGD Technology Study Report Rev 2 0 FINAL
- Annexure C – MCWAP-2A EA Appeal
- Annexure D – Aquatics assessment on rivers and wetlands
- Annexure E – MCWAP2 WULA – Aquatics Review 2022 v1.0
- Annexure F – Climate Change Risk and Vulnerability Assessment of Water Resources in the Limpopo WMA
- Annexure G – DWS Climate Change Policy 2017